Place of Origin:
Guangdong China( mainland )
Brand Name:
DWTC
Certification:
GB/T 19001-2008 / ISO 9001: 2008
Model Number:
FG-340
Contact Us
Plastic Injection Mould ,Double Injection Mold ,Double Color Key Bottle Cap
Quick Detail:
Model NO : FG-340
Place of Origin : Guandong China(Mainland)
Mould Runner : Cold / hot or Yudo Runner
Shaping Mode : Injection Mould
Operation Mode : Automatically
Mould Cavity : Single Cavity, Multi Cavity
Mould Life : 0.3 Million to 2 Million Shots
Installation : Fixed
Export Markets : Global
Detailed Product Description :
Part Material : PE, PVC ABS, PC, PP, POM, PA6( PA66, Gf Filled)
Mould Steel : P20, H13, 718h, Nak80, S136, 2311, 2344, 8407
Design & Program Soft Wares : CAD / Cam / Cae , Ug , Proe , Powemill , Solid Works etc
Plasitc Mould Gate : Sprue / Side / Sub / Winkle / Hot Runner
Plasitc Mould : Supply All Kinds Custom Mould
Plasitc Mould Base : LKM , DME , HASCO , FUTABA , MISUMI , PUNCH etc
Application : Car , Household Appliances , Furniture , Commodity , Electronic , Home Use , Hardware
Application :
We are always committed to close cooperate with large mould and parts manufacturers around the world with years of experience , high production standard and a good reputation in mould manufacturing field . The leading moulds and parts include : automotive accessories , household appliances , consumer electronics , office automation , health care and medical instruments , etc.
Specification
Place of Origin: | Guangdong China (Mainland) | Brand Name: | DWTC |
Shaping Mode: | Plastic Injection Mould | Product Material: | PP, ABS, PC, PE, Nylon,PRT etc |
MOQ: | 1 set plastic mould | Machine: | CNC |
Design Software: | UG,PROE,CAD | Cavity: | single or multi |
Runner: | hot/cold | Mould Steel: | 718H, P20, NAK80, 2316, etc |
Model Number: | FG-340 | CNC Machining Tolerance: | 0.003to 0.005mm |
Product: | Double Injection mold Product | Mould Base: | LKM,HASCO,DME |
Competitive Advantage :
1. HASCO , DME , LKM , FUTABA , PUNCH , MISUMI Standard etc .
2. Multi - cavity Mould , Over Moulding , Gas-assisted , Hot Runner Moulds, Double - coloured mould
3. Tooling Lead Time is as Short as Possible
4. Best Quality at a Reasonable Price
5. Always have 1 contact person during the whole project for both mold and molding . Every week update the working process to clients.
6. Be on your service 24 hours, and make a specific quotation for you within a day .
Factory equipment
Other product view
Send your inquiry directly to us